a’

ROUTINE

TEN2

MSG296

PAGE 02

053

1954

3. THE POSSIBILITY OF USING THE AOMON(SALLY) -—= BIUIRE(TILDA)=
_ LOUWACURSULA)

COMPLEX AS A RESETTLEMENT RESIDENTIAL SITE FOR

| THE DRI-ENJEBI PEOPLE WAS DISCUSSED. SUCH A POSSIBILITY IS

LARGELY DEPENDENT ON RADIOLOGICAL CONDITIONS. FURTHER CON@
SIDERATION OF THIS POSSIBILITY mUST DEPEND ON INFORMATION

ON:
Ae TRANSURANICS CONTAMINATION LEVELS IN SOILS FOR ALL THREE
ISLANDS.
PAGES RUWTFBAS739 UNCLAS
Be CONTAMINATION LEVELS FOR FISSION PRODUCTS» CESIUM 137°
COBALT 60+ STRONTIUM 90+ ETC.* ON THESE THREE ISLANDS.
Ce CHANGES IN LIFETIME DOSE ASSESSMENT AFFECTED BY RESETTLEMENT ON THESE ISLANDSe RATHER THAN ON THE SOUTHERN ISLANDS.
REQUEST THAT INFORMATION ON THE POTENTIAL RADIOLOGICAL
SUITABILITY OF THESE THREE ISLANDS FOR LONG-TERM RESIDENCE

BE PROVIDED AS SOON AS POSSIBLE TO FCDNA® TTPI* MICRONESEAN

LEGAL SERVICES (MR MITCHELL), AND TO HOLMES AND NARVER
PERSONNEL MANAGING THE TTPI REHABILITATION PROJECT.
4. TO CLEAN ENJEBI (JANET) BELOw 40 PICO CURIES PER GRAM

REQUIRES ABOUT 35°000 CUBIC—YARDS OF SOIL REMOVAL. TO

CLEAN BELOw 50 PICO CURIES PER GRAM REDUCES THIS VOLUME
TO ABOUT 9000 CUBIC YARDS. A SENSITIVITY ANALYSIS OF 40
PICO CURIES PER GRAM VERSUS 50 PICO CURIES PER GRAM FOR
LIFETIME DOSE ASSESSMENT waS TO BE RUN TO DETERMINE WHETHER
THE HIGHER LEVEL WAS ACCEPTABLE. THIS ANALYSIS IS NEEDED
FOR SOIL CLEANUP DECISIONS. REQUEST AS SOON AS
AVAILABLE.

Se MR RAY AGREED TO QUERY THE UNIVERSITY OF HAWAII ON THE

POSSIBLE HYDROLOGICAL IMPACTS OF USING CONCRETE RUBBLE TO
PAGES RUWTFBA4S739 UNCLAS

BUILD A JETTY OR AN ARTIFICIAL REEF OFF OF ENJEBI (JANET) >»
THE RESULTS WERE TO BE PROVIDED TO FCDNA AND JTGe REQUEST
THIS JNFORMATION ALSO BE PROVIDED TO HOLMES & NARVER PERSONNEL
MANAGING THE TTPI REHABILITATION PROJECT.
6. THe USE OF PLOWING AS A METHOD OF MEETING RADIOLOGICAL
CLEANUP CONDITIONS waS DISCUSSED. PLOWING IS aN ACCEPTABLE
METHOD UNDER PROPOSED EPA GUIDELINES. IT WAS AGREED THAT
PLOWING IS DESIRALE AS A METHOD OF FURTHER REDUCING AVERAGE _

CONCENTRATIONS ONCE APPROVED CLEANUP CONDITIONS HAVE BEEN MET.

DOE AGREED TO FURTHER STUDY THE ACCEPTABILITY OF PLOWING TO
ROUTINE

Select target paragraph3