A paper on PWR characteristics was considered.
PWR
Caste:
It was particularly
noted that the estimated operating cost (3000 hr core) was 61.9 mils/kwh,
A
of which 39,7 mils/kwh was for reactor core fabrication. At least one
member of the Committee, felt that the Committee should register a protest
BscRLY meager ARLEEE
on these costs,.
:
Pe
.
Fane (pe ops Peaenee
ae ae Te ee
SS
eas
Dr. Fisksaid thatthe military serious-~
ness of such an occasional reduction in yield could be evaluated only -