Discussion at this meeting was addressed to a desire by-the DOD to ST

test the Nike-Hercules missile in a full scak- configuration in Nevada .
with a nuclear warhead.
with attaining complete

The discussion addressed mamly the problems
safety and the reason why the DOD wants this

safety test atithe NTS rather than in the Pacific. o

On the questicn of test detection, ''Floberg said that during a discussion
the previous day with representative Holifield and Mr, Vance, Holifield
had asserted that, in his opinion, the AEC weapons lab were following
a policy of de-emphasizing the possibility of accurate long range
weapons test detection,

Floberg said he believed this was absolutely

untrue but that since the charge had been made , an investigation should
be undertaken to determine whether it had any basis in fact, "'
- The commisssioners approved, on 16 April, a letter to the GAC asking

test program and how the weapons program might be conducted if only
underground testing were permitted at their 58th meeting,
5-7 May.

to be held

mee eR

them to address the adequacy of the commissions present underground

Select target paragraph3