cones in which a vacuum (23 inches of mercury}, similar to the nearvacuum of the upper atmosphere, had been induced,

Examination of these

assemblies after recovery showed that the vacuum remained when the
breathe hole was sealed,
A total of 27 tests using 10 nose cone assemblies were conducted

over a 5-day period.

This work, plus further testing at the Cooper Develop-

ment Corporation plant, indicated that certain points around the forward ballseal joint and the operating mechanism were susceptible to small leaks as

the pressure difference between the interior and exterior of the diffuser=
filter section increased,

The neoprene boot, which covered the operating

mechanism, hadproved to be particularly vulnerable during the Pacific
firings andlater tests.

The reliability of the seal was increased a great

deal by redesign of the boot, and only infrequent minute leaks were observed
after installation of the improved boots,

These leaks were repaired as they

occurreduntil the seal was tight enough to hold a pressure difference of 23
inches of mercury for 10 minutes.

Following the successful drop tests, two flight test rounds were fired
at NAMTC, Point Mugu, California, on 24 July,

The nose comes for these

rounds were modified to incorporate the improvemrents which had been made
during the tests at Morris Dam.

All programmer function times were as

planned and both rounds were judged to be quite successful.
104

Their trajec-