as

0018933

were subjected to environmental tests at North American Aviation Co.
during the month of July.

The tests included low temperature cycle,

vibration and acceleration,
For the low temperature tests, the forward and aft seals were closed

and the programmer and its container were removed.
placed on the "O-rings" of the forward and aft seals,

Thermocouples were
The assembly was

brought to room temperature (75 F°) and the cold chamber was stabilized
at

-65 F°,

The nose cone was placed in the cold chamber and allowed to

stand for five minutes,

At the end of that time, the forward seal "O-ring"

temperature was -10 F°,

The nose cone was removed from the cold

_ .

chamber and allowed to remain at room temperature for 4 minutes, then
completely submerged in water for one minute and allowed to float at its
normal level for 4 minutes.

When the cone was removed from the water

and disassembled, it was found that no leakage had occurred.
The cone used for the vibration test was a complete flight-readyassembly except that the skin around the diffuser had been removed.

The

acceleration load was maintained at 5 g's while the vibration frequency was
varied from 3 to 2000 cycles per second,

The dwell timeat each resonant

frequency was one minute,

The vibration was applied first in the plane

parallel to the longitudinal

center-line of the assembly, then in the plane

,

perpendicular to the center-line.

No failures occurred,

=

SANE

BRENU ERC

102

/0v