Operations Plan - Voyage FY 1978 #4 Cc. PASO is responsible for coordinating any changes in the mission other than minor changes dictated by expediency which can be handled better by the Party Chief(s). Dy H&N/Ent and the DOE/PASO Site Representative, Enewetak will insure that the whole body trailer on Enewetak is prepared and loaded aboard the M.V. Caroline Islands on or around March 22, 1978 (refer to msg. from Director, PASO to HiCom TTPI DTG BE. Feb 78). H&N/PTD will make all travel related arrangements per PASO SOP No. iv. 2418352 SCHEDULE OF M.V. 5. CAROLINE ISLANDS 3/20 Lv Majuro 3/22 Arr Enewetak 3/22 Dep Enewetak 3/23-24 Arr Kwajalein 4/1 Lv Kwajalein 4/2 Arr Utirik 4/8 Arr Rongelap 4/14 Arr Bikini 4/16 Lv Bikini 4/17 Arr Kwajalein 4/20 Lv Kwajalein 4/2] Arr Bikini 5/5 Arr Kwajalein 5/7 Ready for TTPI deployment