.
an Yo ih fh pk
-
ie
ee
eAere
WIL
Bc, PRMER, Boe. BG
Do,
This
PRE
LSREEPES
oy
—
ee
dee
pangrohs
OF WM pass
Copy No, ASLh ov $aee
ee,
Atths2BO Gagne
cf feet...Be. 2BEDE Z
R
Leef,
412003
;
13
COPY NG,
November 24, 1947
REPOSITORY NARA —Lollte f| i-K
KTOMIC ENERGY COMMISSION
coLLection RG 326 46-5] Secre Pe
7
| MEMORANDUM FOR INFORMATION
pox No. (2.9 (AN. 32 6-42 007)
rorpen YW 7/. 6
(4-2 - 47)
Sandstone
TEST PROGRAM FIRING SEQUENCE
Vol- |
Note by the General Manager
1.
The attached draft study on the subject of test program
firing sequence, prepared by the Los Alamos Laboratory,
culated for the information of
2.
is cir-
the Commissioners.
Copies of this draft study have been furnished the
General Advisory Committee and the Military Liaison Committee
for their information.
3.
Your attention is invited to the fact: that the defini-
tive recommendations of the Los Alamos Laboratory will not be
ready until December 1.
Shortly thereafter the staff will be
ready with firm recommendations to you as to firing sequence
and as to the necessity for a third shot.
DISTRIBUTION
COPY NO.
Acting Secretary
Commissioners
General Manager
General Counsel
Ass't General Manager
Director of Military
Application
Secretariat
|
nctaoran
1
2-6
T
8
9
pe
a
10,11,12
:
13 - 16
tong
.
ws
8
oi
.
ow.
) Baal
"When sepoto ld lita than Eat
tei REMI!OFEngnayDiSC UASSEC ATIC NACE
i SEA ed REY
this cdocume:
)
ST REVIEW-DATE:
alige FaeDMARATION TCRETT BTRwen"oO
AUTHORITY:
BAGS L
Mane
GAGS .F1SAsercationch
SSINCATIOM aha
AFTAmey
mame:
2//.1
Bees
(Insert eoper ‘clussification)
of 2NO REwOdTE, LOT, ESSEane
{ _DARTNORITY: £00 |
CLASURICATIONCANCELED=m
te)
SSFED
ae
ond
j
’
J
ce
ea
wocoronlal DEDINEA Soeciryy LeLei
tT
oY 285, feo.
.
‘
ve
ehas si @
Aa FIVE GaGa
Sy Des Ign
Wi HA
Liap p> re
oeYeowdh ca Ie {
~
Date Landis
.
nce
Teby pf
:
|
Cr Fe! ft
SN fe aA
es