-

RON

PLUX MEAS

NTS

Project Officer - T. D. Hanscome
bjectives

Participation in@® was arranged on the basis of
participation without duplication of Project 14.1 work.

om!

sphysical installation tor]
fs planned and effected on
Sslands west of Aomoen.

When the shot location was changed,

Pecipation was reduced to the amount indicated.

The project

tive is to provide data on neutron fluxes from boosted or

onuclear devices for comparison with neutron fluxes from

pei scaly tested devices.

‘he project is also concerned with

Satroguction of plutonium and germanium as neutron detectors
parter to test their usefulness.

<i Sblorumentstion

Detectors were installed on the 1403 line as shown in

—

2.4).

TABLE 2.3-1

INSTALLATIONS

= ¢

Barge
(ez)

,
Detectors

Remarks

-

$2100

Bp, U, Pu, Ge

Recovered except Np

S70

U, Pu, Ge

>

ry

“ee

FOO

6500

6x

Bp, U, Pu, Ge
U, Pu, 66

Ge

Station Destroyed

Station Destroyed

Complete Recovery

Complete Recovery

Select target paragraph3