Chlorination was Bs portedly 0.2 --0.4 parts per uiliion.

SEWAGE Water borne sewage systens only are 15 use on Enivetok,
Sewerage facilities utilize salt mater throughout,

A total of 11,6

ft of vitrified olay pipe (8°) was installed originally with 8 outfalls of 8” eorzugeted metal pipe.

All cutfalls but ons are on th

lagoon side; they range fron 80-750 ft in length for s total of

2,170 2.
RLLCTRICITY < The tain Fower Plant exploys 5 Zeeyele, diesel
operated Fairbenks-brae generators with a rated capacity of 210 HP,

142 Eis, each, for a total of 710 KNs,

Also installed at the Power

Plant is one Fairbanks-lorse gmemtor with a rated capacity of 28) HP,

195 Xvs, The total capacity of ths vain Power Plant is 710 Kxs,
Standby generators are located at other strategic spots through-

out the install.ticn to accomodate facilities such as the communica.
tions center, hospital, afr operations and instrumentation set-ups,
ete,

Diesel units are directly connected to gemrators which are “I*

commecteds

er,
-t

4

. Current is. vent through ‘transformer banks and steppedwp ‘te 2400

volts, It is dlatributed in three legs by the overhead pole system,

One leg feeds the north end of the island, the second feeds the south
end, and the third leg feeds back into the units,
No power failures were experienced during the mporting period,
OATS = The island road net included approxinetely 5,58 ciles

” ef asphalt mrfaced and traffic bouné macaden as follows:

BEST AVAILABLE Copy
REGAATED NOLEss: Fien
SEC ASAY DY DAME pe
p TOE
buzcvuid

3

Select target paragraph3