tools,

Late in August Lagoon Drive was extended through this area

as it seemed to present fewer maintenance probless then the course
it followed along the perim-er of the airstrip.
Conselication of all refrigeration requiremats in the Cold

Storage Center located in Hidg SS was effected during the week of

8 august, Twenty-four refrigeration units of varying sizes totalling
about 18,000 eubie fect were evacuated ia the so-called "Sandstons"
reefer banks located in Bidgs 68 and YO.

The latter installation ms

then turned over to Se AIC Dr disposition,

Demolition wrk, utilizing

acas Amy perscunel and ecuipmsnt, was commenced but, at the close of

the reporting period, had not progressed much more than about 40%,
Two resfer units, 650 cubio feet capacity each, were recovered from

Bldg 68 and xelocated beneath a lean-to shed in the rear of the
Consolidated Mess,

This was dome to accoomodate a large requirensnt

for potatoe storuge.

Y

BEST AVAI

LABLE Cop
y.
a

REGTAT TD USS FED ORDER
eons

rome

ets

Uwe os Dr. Fb

8&2 014

Select target paragraph3