Twenty-five (25) major projects were completed auring
Some of these were in support of JTF 132 operations on Elmer.
Enployment of TDy personnel from Haweii was used to the fullest extent possible
and greatly aided in completing necessary frojects.
Some of the projects
completed are as follows;
One Pacific type building ‘and seven (7) tent frames, pre-cut on
site Fred, were constructed on site Elmer.
Labor
and fateriel, cther than
alucinum for the officer club, were furnished b: the Amy.
Aluminum was
furnished by Holmes and Narver.
& trap shooting range with two target releases were set up for use
of JTF 132 on site Elmer.
Six (6) tables were constructed and installed in cuarters of CJIF
"132 cn site Elmer,
The interior of
the Service Club was painted and merchandise shelves
constructed in the Snack Bar.
.
Now ooncrete floors were installed in five (5} reefers in the
consolidated mess and access sidewalks were refinished with blacktop material.
~
A new float was constructed ‘for use at the enlisted swimming beach.
This float contains forty-two (42) 55 galion oil drums.
-
Security cages were constructed at the Post Exchange, Fost Office,
Finence and MATS terminal of chain Link’ fencing salvaged from site David.
--
Other projects were completed as they were received,