Security Planning and Activities
During the report period, final plans for the security and

travel control systems were made.
Previous planning for the operations of the 516th MP Sve Co
upon its arrival was implemented with the arrival of this unit, as -

well as the 125th MP PM Det and the 18th CID Det, late in August.

By

1 September 1952, dtachments of the 516th MP Sve Co were operative on
Elner, Ivonne, and Gene Islands, pricipally in the conduct of the
travel control system and the guard systems.

The Military Police units, beceuse of thair prior experience
at Sandia Base, adjusted quite easily to the requirements of their

present assignments, . Their status of training and reediness for the
operation was considered highly satisfactory.
In Mugust, preparations for the travel control system were

completed. Photography for the badges needed was nintey-five (95)
percent completed and in the hands of the TO 132.1 security office by
25 August, and approximately eighty-five (85) percent of the badges “
to be issued to personnel of this. tesk group had been 4ssued by 1 ¢-: ©
September.

derial s*curity patrols continued to be florn at the rete of

four (4) per week during the ‘period.

Effective 18 August, the nun-

ber of ground stourity patrols was increased to tro (2) per reek,
and on 25 August, to four (4) per week, thus fully meeting their
requirement for the operational phase.