ee
Be

BUILOeUr IN SUPPLIES, MATERIAL AND SPECIAL OPERATING EQUIPMENT

A major result of the visit by the Task Porse Commander and —
hig staff was the clarification of the actions uecesuary a the

port of the Task Group to provide for its om build-up, and the
procurecont of those items which other Task Groups and the Task
Force will receive from T 152.20

Following the receipt of those

instrustions, requisitions were prepared and forwarded during the

paxth of February to cover all known requirenents for Engineer,
Quartermester, Ordnance, Sigcal and Transportation Corps property.
The items requisitioned fell basically in these oatezorioss
ENGINEER « Lucber, cement, parts, maintenance and building
materials.
QUASTERMASTER « Clothing and equipaze, tentage, ecneral

supplies and spare partes

,

_ ORMARGE @ Vehicles and spare parts, weapons, annmunition

end spare parts.
SIGHAL «
> Rgulpaent aad spareparts.

TRANSPORDATION CORPS = stovedors"equppet.

oO .

PORTCOMPANY AND SAUCK COMPASY = 1/0 end ® requirecente for...3
these mits, bothdue a ‘arrive in the nearfuture, were also

requisitioned.

,

"

“RQ, JTF 182
~ Bequirenints listed by this unit included a
variety of materiel fron ‘the technical services, a2 well as wavy

BEST AVAILABLE Copy

REGRADED LINCLAS® FEO ORDER
SEC ANN BV D7 TR
.

Eccl’
Wire

we

OS

-

Select target paragraph3