oarry-alls ..4 3/¢ tons were placed in serv.

.

Two fork lifts were

also received,

Operational experience for the period
wast
Month -

Vehicles
Operated

March
april

99
99

Vehicles
- Deadlined

Total :
Mileage

og).
‘

45,626
48,785

He

$+ Rater Transportation. Two LoMs and an AV2 continued in
operation during this period.

AV2 87, previously reported as in sush

condition as to need replaceent, was replaced byanother oraft in
April.

However, at the end of the report period the new oreft had not

yet deen placed in operation due te the peor condition in waioh it

was received, and was in the hands of Folzes and Karver for a final ~
timeeups

.

.

,

Aboard the USKS Sgt Millerwere one motor wbaleboat, one
LOPL, and § Loils, for boat pool augmentation.

These oraft were .. 2.:2. ;

unloaded on 80April and 2 Maye

Do,

gy ate Transportetfons A marted inorease tathe anoint ofair’
at

aoe,‘,

ove teHoeuit

transport required‘within the‘atollwas| Fooorded
daarhag theFopert5:

the sake of‘oamperisons
vonth

March
April

:

"Passenger

Jeary

February

.

Passensors

¥iles Plows

Carried

‘Pilot
Eours

2,809: 0 Me ee

“38,608

26,588
19,247

°

=
°

9

472

°° "$20"

=. 99h.
1108 +

BEST AVAILASLE COPY

SER
aah

Select target paragraph3