Tris projes. was completed 16 April, except
of stelving.

or a few minor details

.

be Conference and Classroom The northwest wing of Bldg 15
(Post Hq) was substantially altered by the gonversion of a dead storage
Space to the rear of the Finanse Office into a Conference and Classroom,
A complete floor-to-ceiling wall was erected te lose off the Fooefron
traffic.

a sound~proof dulkhead was erected between the Pinanse Office

and the rooms The plywood chart rack whioh had deen in the smaller
contereme roca Tnow soarerted to an AG Publications roca) was ‘venoved

and aaterged to 24 f% ia width, then placed in the north wall of the

south end of the room, end a projection screen mounted on the north
wall.

,

fate

Poon. A ‘projection booth end fila storage space was erected in the

Student chairs were installed, also @ blackboard and |
vy

Conference tables.

.

wees

This project was, soupleted 18 April,

Latring Gels Bernice on 14 April, |a latrine (some) :
-

oe.

the ameareabis een startids.
-.

soecet

de Dutoher Pep. rr of the ext af April, a meas+ ball
Wee .
:

2 coer

2

ry
eddition of 1 dy was vox complete, ith wiringand plinbtng te.Writs
fini shed.

this Poor was desired to ‘geutralise neat ‘preparation oper fe

ations, to inelude the thawing of frosen meatse

Upen corpletion, whtoh |

is estimated tor 18 May, all neatooutting activities in the oagoltdated|
.

Mess will oonducted therein.

vu

BEST AVAILABLE COPY

ra a.

Select target paragraph3