C.

ST

BUILD<Ur IN FACILITIES.

1.

Ino reased Use of Facilities,

"as Port Faoilities. The Coast Guard busy Tender Ironwood
arrived at Eniwetok on 2 April and departed on 29 Aprile

During ths

stay of this vessel, two new buoys and. one now channel light were ,
installed, while a other lighted pevigettonal aids were completely |
.

cheoked and serviced,

"

the oargo pier at the southwest of Baiwetok Teland
(cocmonly known as Kain Pier) wes surveyed for its capability of
sustained indreased looal traffic. It was decided that major repairs,

. to inslude the addition of sane new piling, were necessary. This work
was begin during the latter part of April, and was epprozinately 1

campleted at the end of the month,
be

Power and Faters

=

,

with the actual inorease in population,

and the antlotpated future tnorease, the power and distillation facile:
ities were surveyed to ascertain their adequacy. Ho ocnditions of
energensy, nature are antisipated in either foltity, Aithough inareased S
" emphasis on oouserration, enpectally ofater, is ehready being.oes tes

enforced vy wait commanders. z
or

/

: o“table ef water somataappears as Table 2 on

page ES
es

:

Tank Pars Rehabilitation,

oe,

©

ae

To prepere for inoreassed

utilisation of ‘the storachand dispersing fecklitios at the POL tank fara, @ program of major rehabilitation was begun during the report

period, and brought to 90% oenpletion by the end of -pril.
:
,

Several
.

BEST AVAILABLE COPY

REC", ~

me

Su

Su.

—

A e

74 IR

74

Select target paragraph3