SUBJECT:
Task Group 132.2 Roll-up (Cont'd)
7.
Activities of the task group in this connection include.
&-
Handling and shipment of over two thousand tons of czrz.
to the Zone of the Interior.
be
Closing out and preserving by cacooning in place or ot. 2
means all commmications equipment not required during the Garrison
Phase.
This included the closing and sealinz of the Commmications
Center on Parry Island and the construction of a dehumitified room in
to
the signal warehouse for the storage of miscellaneous items of signe)
equipment, such as radios, telephones and radiac instrunents.
¢e
The collection and processing of all World War II tyze
vehicles for shipment to FECOM.
ds
The reduction of Navy surface craft in operation couriztent
with new requircments and the shipment of the craft excess to tie
~
os"
requirements of the task group.
e.
The reestimation of air lift requirements inclUTn*? sot:
~e
small aircraft requirements for Eniwetok Atoll and MATS flights requirements
8.
The general clean-up and police of Eniwetok and the improvement
of facilities and activity which wes necessarily somewhat limited during
the Operational phase was resumed shortly after the conclusion of the
Operation.
LEE. SSIPEED ORDER
Ae ou 4 PER
ee ae
_