Reproduced from the holdings of the National Archives
Pacific Southwest Region

Tot J. Py Ryan
DATE® 20 June 1957
FROM: M. Le syanyGonopts,arhect, Dept. SUBJ: WEATHER STATION GENERATORS (Cont td)
—

a

oF

wm

oe

ee

ee

ee

ee

ew

me

we

eee

ee

The three (3) 60KW Generators can be installed te operate in parallel, with
any two carrying the lead (many times only one will be necessary) and’any

one of the generators can be repaired on a ‘eonvenience! rather than an

‘emergency basis.

Additionally, only one set of main feeders would be required from point of
generation to a centrally located camp distribution point and spare parts
requirements reduced to a minimm,

The writer is convinced that these sites are of sufficient importance as to

warrant a complete and therouch review of this situation by everyone concerned,

MLPthd
cet

CHM (3)

MLP

File

@

Supt., Zlect. Dept.

Select target paragraph3