Reproduced from the holdings of the National Archives
Pacific Southwest Region

ACHES

HOLMES & NARVER, Inc.

—

ENGINEERS-CONSTRUCTORS

To: _..DAVID L,NARVER,JR,

sos:884.O/S6477.

_

FROM:RyBORTTCHER.-sé§$C“|s#sSSOsi (sti(stéi(ststé‘iésé :_~=SSBSTATIONLT-KELME
DATE:

References:

1.

3230-EE-<6

20

5203-EE-9

17 JULY 1953

To avoid conflict with fresh and salt water lines shown on Reference 2,
a new location has been selected in the field for the subject substation.

The center of the substation is now lecated 17-1/2 feet from Pole F2D,
normal to the pole line, and 3-1/2 feet toward Pole PU.
Closer checking of drawings before they are issued is requested,

to prevent recurrence of similar conflicts in future designse

LQ. Beutler

RAB2jws
ce:

Se
HO
HO
OS
OS

P. Howell
Chrono
Central
Chrono
Central

OS Engineering (Elec.)

R. A. BORTICHER
RESIDENT ENGINEER
REPOSITORY

NATIONAL

PACIFIC

ARCHIVES

Sou THb/ezy 7 REGION

COLLECTION RE 326 ATonic ENERGY COMMI
SS10

BOX No. £99624 (#60) Ajes3y

326-65 Vo017%0

LLMER CENTRAL

’

ny

FOLDER 268 SY4 PROTECT ENGINEERING Fig

fy.

a

oo

sf

at

;

i

J “
wok ‘
a

a

a

”

mo

wat

_*

y

.

oy

Sst

NG
ste *

ty

:

a.

ES

74

.

ute
.

™,

rid

=

aot ak

at

100M 5-52 M&S

&

i

ey?

a
Fa,
7

4
4”

af
au

ed

a

Re
,

Select target paragraph3