approved proceeding for preparations for bio-environmental survey for Project Chariot during the summer of 1960; approved an HE scaling program; and noted that the Livermore Lab will continue the study in development of the Ditchdigger device and probably undertake preliminary field work for an experiment in late FY 1961. Also it was noted the State Department should be informed of the plans for Gnome and Chariot and their advice sought as to whether to proceed with Ditchdigger. Meeting #1590, 4 February 1960: Further discussion of the Gnome shot and Plowshare gives a summary of the objectives: ''(1)To exp’ore the feasibility of concluding nuclear explosive energy into latent heat which would be available of electric power; for the production (2) To investigate the feasibility of recovering from natural salt useful isotopes produced by nuclear explosives; and (3) To extent knowledge about characteristics of an underground explosion ina medium (natural salt) having physical properties in marked contrast to the only medium (volcanic tuff) for which such information is presently available.'"' Also note that the Commission felt at this meeting that it probably would not be possible to conduct a Ditchdigger experiment in the near future, at least where the entire configuration of the tunnel and instru: aentation could be open for inspection. Meeting with NASA Representatives, 24 February 1960: At this Commission meeting, Ff. Keith Glennan, the Administrator of NASA and several of his staff were in attendance and the Commissioners covered a wide range of items where there was mutual interest and interaction 107

Select target paragraph3