Be? -SECRET-
ATOMIC ENERGY COMMISSTON
WITHDRAWALS FROM THE STOCKPILE
FOR OPERATION SANDSTONE
Report by the Director of Military Application
THE PROBLEM
1.
To approve the withdrawal from the stockpile of weapon
components for Operation Sandstone.
BACKGROUND
ce
Withdrawals from the stockpile are required to meet the
approved schedule for Operation Sandstone.
Commission authority
is required for withdrawals and expenditures of stockpile items.
DISCUSSION
i ,
ial
SUNG
3.
It is considered necessary that the following items be
shipped overseas to permit proper conduct of the test:
Samy
4
7
:
:
7
~ a
.
.
al
i
eI
|—
oan
.
pee
eS
eT @)
a’
n
A
- a |seinen Chapa aRee
rn.
a CRUD Ir
OAAy ib
wre
Ligh
Ree ” onan, tocomrersa te
ge
: E :
ag ES
ny ee
fre
PB