ses the final arrangements A 27November TWX from Betts to Hertford of ALO discus In addition and Ryan. for the Christmas Island Tour which will include Ogle ing about 5 December, to the dates of the tour which is to take place beginn consumption the need for strict security is emphasized and a story for local purpose of the that Christmas Island and only then if necessary is "the possible use of the party on Christmas is connection with survey work for 4sland in extension of satellite tracking facilities." r from a Mr. James Carr, Note should be made here of the 3 November lette Seaborg which expresses the Acting Secretary of the Interior, to Chairman trust territory l.e. deep concern over the possibility of use of the Tt's a strong letter es. Eniwetok and Bikini for the testing of atomic devic g recommendation from which lists some reasons briefly and states a stron against any further testing the Department of the Interior that they recommend in the trust territory. _27Nov. 61, J-7 Report: In this section on weapons testing, under the groups Se accomplishments in the area of support hardware for underground testing is listed by hole number the status for various pieces of hardware being completed by J-7. BY For instance, underground support stands, equipment racks, and outside cangisters are completed for a number of holes. 27 Nov. 61, J-6 Report: ry The following progress is reported at the NTS; Hole U-3 ah was completed. | U-3 ak was completed with 29 in. diameter to a depth of 1199 ft. 6 U-3 ai complete to 1168 ft. with 36 in. diameter. y U-3 ad complete to 201 ft. with 36 in. diameter. . U-3 am abandoned at 550 ft. due to inability to straighten the hole. Problems are being encountered with a new attempt at this hole about 350 ft. to the west. U-3 aj drilled to 120 ft., then abandoned because of coax and casing problems. Numerous other shot holes and exploratory holes and instrumentation holes at various stages of completion in Area 3. Other J-6 activities included the following. Hi-Vac machine were both received and put in use. activities at the NTS is detailed. The 100-ton crane and the new Other support of testing J-6 representatives attended a meeting on Christmas Tree as well as a meeting at H & N in Los Angeles on "Blue Straw." At the latter meeting determination was made of reasonable budget figures for an overseas operation as presently being considered by Livermore and LASL. With the benefit of not knowing where the series would be, the following rough fiqures were

Select target paragraph3