/ to the laboratories An 18 vovembed TWX documented in other notes from Betts . —— chaired by Seaborg and notes that the President has appointed a committee F J atmospheric test including others such as Jerry Johnson to review the be discussed with program and come up with a U.S. positon which will then rg's committee a United Kingdom committee and that this effort of Seabo will begin the week of 20 November. wr Here is a 20 November 61 report on a meeting at Holmes and Narver on 17 Novenber "To Establish Estimates of Cost and Time Schedules for Construction and Support of Proposed Pacific Operations." It is written by John Pollet and notes that among the conferees were representatives of ALOO, Los Angeles Office, LASL (Newman), Livermore (including Gibbins), Sandia, EG &G, DASA, and H & N (including Ryan, Spain, and Pollet). Following the direction of the NIS Planning Board on 11 November, this group assumes that Eniwetok PIV will not be available, that there will be no atmospheric testing at NTS for the time being although the balloon areas (7 and 5) are to be maintained, and that Pacific testing will begin on or about 1 March 62. meeting came up with estimates of the construction Thus this costs and schedules for accomplishing any or all of the epproaches that would utilize Christmas Island, Jonnston Island for high altitude tests, and an open sea operation off Hawaii and Jonnston Islend. Considered are about twentu-six different shots in the Pacific with some to be using balloons, most air drops, end at least one requiring a Liberty Ship or some sort of surface platform. Note also in this time frame, about 20 Nov., that Sandia and EG&G submitted 10g rather detailed estimates of support in the way of costs and equipment for a WTeeee Christmas Island type series.

Select target paragraph3