ee oe wn seve petparaeiuils wlis De reviewed by the committee, in consultation with the Director of the Bureau of the Budget. The President has decided that (a) No FY 63 budget proposals for the financing of test preparations will be made public. (b) FY 62 expenditures will be financed by use of the emergency funds, with a supplemental request to be made as necessary." On 15 November Gen. Betts sent a memorandum to Chairman Seaborg on the subject of theavailability of sampling aircraft. In part the letter states that it is felt that there is sufficient BS7 aircraft with the low altitude capability to meet those needs. However, the BS7D aircraft which are the only available Sampler aircraft to meet our high altitude sampling needs are in a marginal status as to the number of aircraft to meet our requirements. There are in fact 4 BS7D's available to the AEC but in fact only 3 of these are useable. There are 13 other B57D's in the Air Force inventory and the following is true of these: '4 are assigned to the Air Defense Command for a high priority mission, 6 are in Europe extensively modified for a high priority mission there, and 3 are assigned to the Air Force Systems Command. The 3 assigned to Systéms Command might be available, providing they. have not been modified to the extent they are unsuitable for sampling purposes. A determination would have to be made, of course, of the relative priority Our mission vs. that to which they are assigned in the event we require more than the 3 BS7D's now on hand.'' It is thus clear that there is some question as of November 15 as to the readiness of the Air Force to meet the AEC's atmospheric test sampling needs. ss A 16 no! message from Newman to Sanders at the NTS gives the specific LASL NQ Reesoy vertical hole work required through the completion of Ivanhoe. Newman requests that authority be confirmed for design and construction of 21 holes in Area 3 and 1 in Area 4 ranging to a depth of 2500 ft.; as well as 1 6000 ft. hole in Area 15 (UL5E). Moreover, 2 1600 ft. vertical holes and 2 1200 vertical holes with drifts at the bottom are to be designed and constructed for Ivanhoe and these are designated U3BB through U3BE. Newman emphasizes how tentative these projections are. ivermore dated | 16 i of Live document from Bob Petrie i Here is an interesting “Nov. , and e is "Engineering, Construction 61 to Jim Reeves and the titl ratory ax Christmas for the Lawrence Radiation Labo Construction Support Required Island i n." j atio Particip estimate of the initial i is j a somewhat detailed is This i k type ope ration to support both a quic i construction and more extensive scientific n there, merely a long term or extended operatio at Christmas Island as well as i ents. for Livermore's requirem oon udes support for bargge shots, > ball i It incl drops. launched tests as well as air

Select target paragraph3