in a fully airborne operation. Such a short-term test program with optimum diagnostics could be conducted in connection with Kuinerak either Eniwetok or Johnston Island, but would obviously be easier to support technically and logistically if conducted in connection with the EPG. The considerable acceleration of our developmental test program that could be possible by turning to this intermediate type testing program leads logically to the conclusion that the Commission should strongly support a recommendation that we be released immediately to plan for and execute such an operation.despiksextkexteetnisai Despite the technical and logistic advantages of conducting such a short-term test program at the EPG, to avoid the problem raised by the trust territory situation, we recommend the operation be based on Johnston Island." A_1 November TWX from Headquarters Air Force to all those involved / <~- mee eg changed the nickname from EVERREADY TO BLUE STRAWfor the Air Le Ba Force support of nuclear testing. A 1 November TWX from Headquarters Air Forceto all commands involved in plans for atmospheric testing notes that the proposed weapons test plans and operation plans and the proposed SAC operations launch directive are all approved with certain changes to the SAC launch directive. That is that Taongi Atoll is not available asa target and that SAC must select a new target outside of the Trust Territory. The corresponding target and trajectory data after coordination with AEC and AFSWC should be reflected ina corrected launch directive. Apparently the OPs Plan being used is number 6-61 of which Phase I and Phase II cover the Air Drop Operations and were written by AFSWC and Phase IJI was written by SAC and covers the ATLAS systems Test. Any nuclear safety concerns and required protection measures to be taken at Vandenberg are to be augmented immediately. The end of the message states "Preparations based upon these plans up to and including ALERT of equipment and personnel for overseas movement are authorized. Movement of elements of the Air Task Group (Provisional) to overseas base will be initiated only upon receipt of execution order from Chief of Staff, Air Force," BZ

Select target paragraph3