at the tine. 16 is entirely possible thst separste test estivities wmder eentrol ef both UCKL and Lisl ney overlap tinewinze in different areas at the sam tine, pessibly with independent test directer organise: tions. Under the sbeve existing and predable eonditiens ef operation, it appears obvious that tle owitehing of veepousibility fer, end eentrol of, the reé-safe werk would reeult im complete confusion and peesibly would werk enly if eseh pertisipsting ergenization had its om ecaplete feeilities end ergenitation. The result would be inereased evst and very inefficient we ef perecmmne ee AY ATLARLE 4. DenisFim! & besie Rad-Sefe Flien cowering the proposed eonee:t ef eperatiens is sttached. In genersl, the on-site supperting fmetions would bs perferued by the NTS Support Centraster under the iamediste direstion of the Les Voges Brameh Cilef (er as apprepriste, the aPC Suppert Direeter). The Test Division, BFOO (Test Henager), would establish, in svafernaec with Countasion-esteb!ished pellay, genarsl rules ecneerning perniesible exposure end red-sefe gontrals. Feeh organisation partieipsating in my type of setivity ot NTS would retain thelr responsibility fer the gefety of their own employees ond ether personne] under their direct supervision. The steff of the Bremeh Chief would supervies the syp- pert operation and weuld fupetion in a sfvisery capesity to all participating ergemizations with respeet te sttaining ecmpliance with = 9 o S DOE ARCHIVE 54