cost

$36-42 million.

revegetation

of

They would entail

the

denuded

island

perhaps

at

an

10 years

additional

for

cost

the mature

of

some

$6-8

million.
The

Bikinians

causeway

between

construction

have

requested

Eneu and

Bikini

would

double

the

that

the

islands
overall

spoil

be

(September
cost

and

used
21,

has

to

build

1984).
been

a

Such

questioned

environmentally.

Some
States

additional

and

estimate

the

of

information

Bikinians

external

to

dose

will

reach

be

a

that

required

final

to

assist

decision.

specifically

A

considers

the

more
the

United
refined

beta-ray

component should be made. The contribution to internal dose of strontium-90
in fish bone and in foliage should be examined further.
Pilot studies within the next two years are recommended to determine

the

following:

where

(1)

the cesium-137 content of plants grown in locations

30 cm or more

topsoil

of

topsoil

have

been

removed;

(2)

if

the

loss

of

and the compacting effects of the excavation operation per se will

materially

impair

limitations
possible

of

toss

the

eventual

ground
of

water

Bikini's

productivity

supply

seaward

on

of

both

beach

as

Bikini

Eneu
a

and

result

soil;

(3)

the

(4)

the

creating

the

Bikini;
of

peripheral landstrip; (5) the effectiveness of high-potassium fertilizer in
blocking

the

uptake

ancillary use.

of

cesium-137

by

plants,

However, preliminary civil

a

technique

of

potential

engineering planning may begin

now, as well as work on a proposed draft environmental impact statement.
Aside
sees

the

need

community
economic

from

the
to

immediate

initiate

facilities,
activities

and

that

problems

planning
for

will

with

the

eventual

be

essential

community.

5000007

of decontamination,

8

the

Bikinians

subsistence,
for

for

the

committee

housing

and

agricultural

and

the maintenance

of their

Select target paragraph3