TABLE 9

ITEM

fe

TOTAL COST'OF ISLAND EXTENSION AND BERM
BIKINI ISLAND AREA = 2,400,000 m2
b
VOLUME REMOVED/ FILLED = 720,000 m?

TOTAL COST ($10%)

NO FILL

-

1. MOBILIZATION AND DEMOBILIZATION COSTS
® BARGE HONOLULU TO BIKINI
© PIERS BIKINI AND ENEU
® BASE YARD
® CHANNEL
@ EQUIPMENT AND LABOR

700
3,500
250
750
540

2. SUBSISTENCE AND LODGING @ 645/MAN Day

5,700

1,700

3. VACATIONS @ $6,260/MAN YEAR

660

4. SURVEY BIKINI ISLAND, TOPOGRAPHIC
AND RADIOLOGICAL: QUALITY CONTROL

5,600

5. CLEAR AND BURN VEGETATION @ $1.30/m?

3.100

6. EXCAVATE FILL AND MOVE TO BERM @ $6.30/ne

4,600

7. QUARRY AND BUILD ARMORED BERM USING
GEOTECHNIC FABRIC @ $90/n¥ OF ARMOR ROCK

7,300

SUBTOTAL

8. BURDEN @ 47.3%"

oveniean Woe ==
PROFIT
BOND
CONTINGENCY
SUPERVISION AND

(seNO eee)

= 8%
= 0.6%
= 20%
= 5.5%

ADMINISTRATION

28,700
13,600

‘

FILL (ADDED TO NO FILL ABOVE)
1. MOBIUZATION AND DEMOBILIZATION

2.
3.
4.
5.

@ FLOATING DREDGE EQUIPMENT
SUBSISTENCE @ $45/MAN DAY
VACATIONS @ $6,260/MAN YEAR
DREDGE ANO TRANSPORT TO BIKINI DOCK @ $12.60/m?
HAUL AND SPREAD @ $5.40/m

6. BURDEN @ 47.3%°

2.900
680
260
9.100
3.900
SUBTOTAL 16.800
7.960

SUBTOTAL

25.000

BEAM + FILL

67,000

Costs estimated to two significant figures, 1984 dollars.
Volume to be removed
specific activity.
Overall

to

achieve

4.64 pCi/gm

average

burden computed by taking product of individual

(1.02) (1.05) (1.08) (1.20) (1.055) = 1.473 or 47.3%.