TABLE 7

UNIT COSTS (1984) OF EXCAVATION
PLANS FOR BIKINI ISLAND*
TEM

UNIT COS T

1. VEGETATION
CLEARING AND DISPOSAL(BURNING)

$ 1.30/m

2. EXCAVATION & HAULING SPOIL
TO DOCK OR TO ISLAND’S SEAWARD PERIMETER

$ 6.30/m:

3. BAGGING SPOIL

$12.40/m3

4. CONSTRUCTION OF PERIPHERAL LAND-STRIP WITH BERM”

$90.00/m3

5. OUMPING SPOIL IN LAGOON/OCEAN
LOADING AND UNLOADING BARGES FOR MARINE
DUMPING (UP TO 60 KM ROUNDTRIP}

$ 5.90/m3

6. BACKFILLING EXCAVATEDSITE
DREDGING LAGOON SEGIMENT
HAULING AND SPREADING

$12.60/m?
$ 5.40/m?

_

7. CONSTRUCTION CAUSEWAY
HAUL SPOIL TO CAUSEWAY FROM ISLAND
ARMORLAYER
CULVERTS(60; 1.52m DIA, CONCRETE)
8. DISPOSAL ON NAM
TRANSPORTTO NAM, UNLOAD AND SPREAD

a.

In the Marshall

$ 3.60/m
$86.00/m3
$39,000/culvert
$12.20/m3

Islands, costs are estimated at 2.4 times those in the

continental U.S. (see references on following page).

Unit costs will

tend to be significantly greater (about 300 percent) on smaller islands
owing to the relatively greater cost of landing equipment and supplies,
and less efficient operations required for small volume excavation.

The majority of these estimates are provided by The Pacific Division, -

U.S. Corps of Engineers (Ref 6, next page).
volume of spoil to be dealt with.

b.

See Table 9 for depth and
"

The estimated cost range for replanting coconut trees is $2 to $4 per
me,

c. Not including Items 1 and 2, but principally for building protective
coral-rock armor layer.