Ltr, SWS, 4950th TESTGU(N), dtd 24° Jul 57, “Comments to Final Report of the
~
Commander, TG 7,4, Operation REDWING"
ITEM

38.

REFERENCE NO

COMMENTS

TII PV A, paras

See Item #4, page 2.

4.5 -~ 4.10

An SOP has been set up to

permit early end forceful followup of all delin-

quent reports.

If the present time scale can be

adhered to all requirements will be carefully

scrutinized for accuracy and elimination of

39.

III P

Wn <4

excesses.
A, paras

29

The establishment and maintenance of stock record

cards have been prescribed in the TG 7.4 logistic

Support Concept which has been distributed,

This

procedure will be further described in the TG 7.4

Logistics Support Plan scheduled for publication
1 August 1957. The present time scale for proces-

sing of requirements lists will permit the estab-

lishment of a timely and workable arrangement for
servicing of the using elements,

Detailed procedures

will be published by the Test Base Unit (the 4951st).

The experience level of personnel assigned to AFB
2872 is excellent, The Director of Personnel, 4950th

Test Group is closely monitoring the assignment of

personnel,

The requirement for augmentation of AFB

2872 has been spelled out in the TG 7.4 Logistics
Support Concept and will be specified in detail in
the TG 7.4 Logistic Support Plan,

40.

III P V A, paras

6.3 - 6.12

Drawings have been received, and approved by this

Headquarters, for expansion of the POL storage
facilities on FRED, This expansion, which will
increase our aviation fuel storage capacity by

840,000 gallons will eliminate our storage problems
as recognized at this time.

41.

42,

43,

III P V B, paras

III P V B, paras

1.6 & 2.4 ~ 2.6
I

3.32-3.6

B, paras

& 4,3-4.5

It is planned to establish a Maintenance Control

Unit for HARDTACK, Preliminary drafts of SOP's
are being prepared.

See Item #41 above, Detailed experience levels will

be prescribed for field maintenance augmentation

personnel to be furnished by elements of TG 7.4.

Detailed requirements for MCU communications have

been established,

It is planned that MCU personnel

will deploy to the EPG in sufficient time to permit

& Complete check out of MCU communications facilities,
Also see Item #5, page 2.
10

:

ak

Tanel Aa 10

np WLS HQ

Select target paragraph3