Ltr, SWS, 4950th TESTGU(N), dtd 24 Jul 57, “Comments to Final Report of the
Commander, TG 7.4, Operation REDWING" ITEM

REFERENCE NO

COMMENTS
TG 7.4 will check on survival gear and training as

3h.

soon as definite units and aircraft are assigned.
As soon as these units and aircraft are assigned,

USAF will be requested to direct aircraft accident
accountability and reporting responsibility be sinilar to that used in REDWING,

356

III P V A, paras

1.6 - 1.15

AMC has reestablished Project 28 (now designated

Project F-28) as a permanent project,

The Logistics

Liaison Section has been manned by one (1) officer
and three (3) sirmen during the interim period, and
is permanently located at SMAMA,

Requisitions for

the 4951st Suprort Squadron (formerly the 4930th

Support Group) are being processed thru the Logistics
Liaison Section of this Headquarters.

The personnel

asSigned to this Section are particularly resource-

ful and highly qualified, all having gained valuable
experience on REDWING, Personnel presently scheduled
for assignment to the Logistic Liaison Section have

been interviewed, and appear to be very well qualified for their duty assignments. For additional
information see Item #2, page 2.

36,

III P V A, paras
2.5

-

2.9

The present schedule of events calls for submission
of requirements for prepositioned supplies and

equipment not later than September 1957, Our only
problem in this area is the designation of elements
of TG 7.4 in time to meet this date. Vigorous
action is being taken to have these elements des-

ignated as socn as possible, Our Logistics Support
Concept, distributed 10 July 1957 satisfies this

recommendation,

The format for submission of proj-

ect kit requirements, now being prepared, will include these recommendations.

An assembly type AFSD

will be used by the logistic Liaison Section in
processing requirements lists for prepositioned
supplies and equipment.

37.

III P V A, paras

See Item #36 above.

Procedures have been set up to

permit maintenance of complete records on local

purchase and stock fund items, The processing of
LP requests will be closely monitored by the Logis-—
tics Liaison Section and this Secticn is set up to
closely monitor the commitment of funds by SMAMA,