ANNEX H TO TASK GROUP 7.5 OPERATION PLAN
Natural Disaster Plan
a.
The Natural Disaster Plan for TG 7.5 will be executed on order of
the Commander, which will be issued when a typhoon or tidal wave
is imminent.
The emergency signal for the execution of the plan
will be a series of prolonged blasts lasting three (3) minutes.
The following tasks listed in accordance with priority of accom-
plishment will be undertaken as time permits.
(1)
At all island camps, except Eniwetok Island and Parry Island,
the Holmes & Narver Area Superintndent will be in charge and
wil}
(a)
Secure power house and distillation plant
(b)
Secure reefers and provide stand-by generator for reefer
needs
(c)
Fill water tanks and guy towers
(4)
Secure and guy all semi-permanent buildings
(e)
Assemble all equipment and vehicles, with lightest vehiciles stored in the center
(f)
Strike tents and store with tent furnishing in latrines
and mess hall
(g)
Require postage stamps and cash of all revenue producing
facilities to be turned over to an Accounting Division
representative for safekeeping
(n)
Beach light marine craft, if practicable, and man all LOUs
(4)
Be prepared to assist in the evacuation of all personnel
together with classified documents and records, to TG 7.3
vessels in the lagoon, if so ordered by the Commander of
TG
(2)
7-5.
At Eniwetok Island and Parry Island, where applicable, theCon-
mander of TU 7.5.3 (General Superintnendent of Construction)
will
(a)
Monitor power and communications lines
(b)
Provide emergency crews for:
Electric service cut out
Water service cut out
Airfield clearance
General salvage
H-1
(Ben
PT
ze ee aaa
ed
gn
eee
iN, epeetpt Jy