@
8 Sreeoe»Seneromeing
. te see we ES ae
(sadeELfw
naa bey
te
ag
FUNCTIONS ASSIGNED TO TASK GROUP 7.5
-
l.
May 25, 1953
(Rev. 10/1/53)
General Responsibilities a.
Engineer and construct al] base facilities at the Pacific Proving
Grounds necessary to support the Task Force and AEC and its con-
tractors in the conduct of test operations.
Engineer and construct ell test structures required for experimental work during test operations.
Maintain all base facilities at the Pacific Proving Grounds except
for the military communications facilities on Eniwetok Island and
military communications facilities at Bikini Atoll.
Operate, manage, and direct camp facilities and supporting facilities at the Proving Grounds, to include the following:
Special Rereview
‘ination
(1)
Provide subsistence, quarters, laundry, medical, recreational,
and other camp services on all islands except Eniwetok, where
these services are provided by Task Group 7.2. Blocks of housing will be assigned to Joint Task Force SEVEN Headquarters,
TG 7.1, and TG 7.5, within which the respective groups may assign spaces according to their own wishes.
(2).
Provide land transportation service on all islands on Eniwetok
(3)
Between operational phases provide and operate boat pools at
Eniwetok and Bikini to support operations and construction at
and Bikini except in those circumstances where the use of vehicles organic to military units is apnropriate. Operate a motor
pool on Parry and other islands as required, to include all vehicles assigned to TG 7.1 and 7.5. Maintain all vehicles asSigned to these two groups, regardiess of ownership.
these atolls and provide CTG 7.2 with AEC requirements for inter-atoll surface lift. During operational phases provide and
operate boat pools and establish inter-atoll lift requirements
in accordance with procedures to be mutually agreed upon with
CUTF SEVEN.
(4)
Between operational phases provide CTG 7.2 with AEC interisland
liaison airlift requirements to support construction and opera-
tions at Eniwetok and Bikini.
Dispatch such aircraft in coordination with CIG 7.2.
During operational phases provide the ap-
propriate Task Group with Joint TG 7.1 and 7.5 liaison airlift
requirements and participate in dispatching such aircraft in accordance with procedures approved by CJIF SEVEN.
(5)
Operate all utilities on all islands, excepting the communications facilities on Eniwetok Island, the military radio communications facilities at Bikini Atoll, and the POL farm on Eniwetok
Island.
III-1
™
Cometem my
"e
Teta re
et ne
OP ee