Vane ne wp ee SUMMARY OF INSTRUMENT SURVEY AND FILM MEASUREMENT® ON B-57B AIRCRAFT H+ $2 min ~_Film rep/hr Detonation Hours TiB Max Ave H+ 68 min; H+ 78 mia Filri rep/br Min TIB rfor Max ave Min TiB cfr H+ 41 ris Film rep/hr Max Ave r/nr Top of awe 2w4 4to7 Twe 20 __- #0 _ _ 30 _- 16 ~ _- 03 0.3 0.2 65 64 26 64 23 14 % ul ik 0.8 O2 O.1 63 20 is 13 4 3 8 : 2 Ride of fuselage below canopy Pe 4uwtT Ttod 0.2 _ _ 20 _ _ 4 _ <1 _ _- OK 0.1 On 12 6 6 6 3 a 3 2 1 0.6 O21 6.8 27 8 20 4 1 t 1 <1 <2 Lapelntod gun cover on leading edge 204 4toT Twe 30 _- wo _ 100 _ —_ 66 _ ~ 1.6 $3 0.4 ©6410 175 x 06 3 36 ee 32 2s 28 6.6 04 9s a7 au 32 13 e 16 10 6 Painted loading edge, inboard of engine 2w4 4toT Tws 3.0 0.3 - 190 80 _ «0 16 - 2 10 - 39 1.8 08 _ 190 200 270 a0 a 146 38 35 40 1.2 0.6 36 “4 8 18 4 3 § 3 : Sido of tip tank 204 4to7 Twos 1.5 0.2 _ 50 3 _ 15 10 _- 4 4 _ 0.8 0.3 O2 416 28 20 38 42 1 x 16 & 14 0.2 0. » 17 7 12 4 2 q 3 1 TABLE A.3 BU:4MARY OF FILM/T1D AND APPARENT BETA/GAMMA RATIOS FOR F-64 AIRCRAFT Shot Inca ‘Time of Penetration Rho? Evia wareem Time Aller Hours Tima of Penewation H+ 67 min; H+ 62 rain Film blax Hiot Spot T1B Aly Area Bly Film htax TIS _ ~ 16 Ta Sido of air intake Zto 4 4toT 310 _ ~ ~ 230 ~— Side of fusclage Zto4 4to7 Tod 80 _~ = _ ~ -_ 7 _ _ Leading edge of wing, midway between root and tip Zto4 4 to7 7d 650 225 _ 1 80 _ Bide of Up tank 2to4 4in7 7Ttod 18 100 _ _ ~ ~ 7Ttos below canopy _ it + 81 main; H+ 86 min Film Ave _TiB ~_ Film Ave T1IB Area 8/y 185 ~ ~ _ 10 12 15 — ~ -~ 6t 128 60 —_ 16 — 300 100 _~ 35 50 ~ 80 “e 66 e “0 6s 16 12 12 4 21 ~ 28 16 ~ —_— _ _~ 62 64 93 65 150 ” 18 16 2 20 28 268 ~ 33 Hw Gpot f/y ~ ~ —_ 20 20 ~ ~ ~ ~ PE on B-87B Airoratt shot Dakota Tle of Penetration Shot Yisthead Time of Penetration Shot Zuni Time of L snetration Time After PEC PEE Location of Film wee eehe ayce RE ee TABLE A.2

Select target paragraph3