tazination was found in regions which confirmed the forecast cloud tre-

jectories, the requirement for H/24 through E448 hour tracking coverage

was cancelled.

4s a result of the report from Rongerik, the advisory to CINCFACFL?

at 2000 hours B Day included mention of fall-out at Rongerik plus ginor
fall-out at Rongelap and other northern Marshall Islanis. The fall-out

was attributed to an 2/12 hour change in the forecast air particle trajectory for the twenty thousand foot level.

This trajectory, foraerly

moving toward the EXE, was reforecast to move toward SE in a circular
clockwise path through south to west. The CINCPACFLT advisory included

no health hazard problem for surface and air routes, but that fall-out
on Bikini-dtoll, as well as damage to structures, would delay reentry ser
eral days.

:

During the trip back to Eniwetok on the night of B Day, the fleet en-

countered a wide area of finely divided (arparently less than 5 micron)
particles which caused top~side intensities as high as 350 or/hr. App-

ropriate measures were instituted by the Navy Task Group Commander to the
affect that all personnel not essential to open deck duties would remain

indoors.

Ship's weather doors were closed and the washiown systeas ope=

rated intermittently to bold down the levels.

Based on the advisory from the weather detachment that their instrne-

ment was off-scale, the Air Task Group, on the morning of 8/1 day, sent

a monitor by amphibian aircraft to check the Rongerik situation. This
gonitor upon arriving over Rongerik, reported the atoll contaminated and
requested permission to start evacuation of personnal. At about 1300

the monitor reported readings on Rongerik of 240 m/hbr at 250 feet and 3.2

r/br one inch off the ground.

The Rongerik evacuation was comleted in

two segments, the first group (8 people) coming out by B30 hours and the
second group (20 people) by 5Y35 hours.
The special AEC/NYOO Kwajalein Flight ABLE, requested the previous

right, had been instructed to make an in-flight report upon reaching Taongt.

(4 preliminary Flight ABLE report indicated 1350 m/hr on the ground at
Rongelap, 445 m/br on the ground at Ailinginae ani zero for Wotho.) &ccordingly, it was decided to start a destroyer on the way to Ronrelap ia-

rediately and to set up a Sh-16 amphibian with monitors to check the sur-

face comtitions at Renzelap before dark. The destroyer was directed to
be off Ronzelap ready to start evacuation at dawn the following day. 4

Trust Territory representative sith interpreter was requested to move by

PSY from Kwajaledm to arrive et Ronzelap at the same tine, The Ss-15 was
set up, two respemsible monitors were especially triefed to make reaiings

at weist heicht, use several meters of the same type for comparison and
to use different types for cross-check, An average reading of 1.4 r/ie
made in the living ares of Ronzelap Island by these monitors was used in
the decision the saze night to order the destroyer to commence evacuation

operations at dawn,

Evacuation operetions began about 0730, 3 March and

Select target paragraph3