aairie?
ven gn0r®

—

4.

GENERAL:
a,

por ®

(Page D-5)

Construction, rehabilitation, instelletion and service checking of

commnications facilities in support of Operation CaSTLE (RESTRICTID, SI)
will be completed by 10 January 1954,
#

ANNEX E:
1,

*

*

*

*

(Page E-3)

RESPONSIBILITY:
-.

Weather Reporting Eloment:

(3) ‘Requirements:
*

(a)
5.

Beginning on 7 Fobruary 1954, assume typhoon recon-

noissance responsibility in the area bounded by the

Equator, lotitudg 25° North, the Koridien of 180° and

longitude of 157°31' East, The Joint Task Force Weather
Control will coordinate this effort.

oa

ANNEX BE, APPENDIX 3:

*

(Sec Jttachment i/1)
%

T

ay

2:

+

1.

%

(Page J2-1)

‘dd line to Chart:

2NNEX_K:

*

FSP direct to TEST PROGR.S,

(Page K-1)

ATRORFT_COVTRCL POLICY:

d, Aircraft control is e broad term encompassing both overall control end
direct control defined below:
(1)

Overall control is defined as supervisory control of 211 aircraft
participating in the opcration, exercised either directly or
through subordinate control agencies,

(2)

Direct control, also referred to as "Primary Control", is defined
as movement control of designated aircraft exercised through
direct ond frequent redio contcct,

*

2, THE COMMAND SHIF CIC:
a,

*

*

*

Bo

(iege i-1)

CIC Facilities:

(1)

*

(c) Seven (7) PPI scopes adequate for control of aircraft.
=

CHANGE NO. 1
TASI. GROUP 7.4
TRS ORDER NO, 1-53

*

%

Select target paragraph3