(a) Bight £8) WB-29 Weather Reconnaissance Aircraft.
(d)

Two (2) SA-16 Search and Rescue Aircraft.

(c) Additional aircraft as directed by Comdr JIF SEVEN.

(2)
‘4

(3)

mo)

B-0 sy Ca. fhar AK

Conduct the following missions for an on-site operational
period of approximately 120 days:
(a)

Two 12 hour WB-29 weather missions per day, commencing

(bv)

Three 12 hour WB-29 weather missions per day, commencing

(c)

Two 12 hour WB-29 radiological safety missions per day

(a)

Two 8 hour|SA-16 missions on shot and rehearsal days.

(e)

Additional missjons as directed by Comdr JTF SEVEN,

on first shot minus 20 days.

on first shot minus 4& days.

from shot day until shot plus 2 ‘days.

we

baw

Cac ctm

Wheto SHARAN a

Be prepared for possible delays in

the operation which may

extend the requirements listed in subparagraph (b) above

for an additional three (3) days.
4

(4)

Beginning on Seonr950, assume typhoon reconnaissance
responsibility in the area bounded by the equator, latitude

25° North, the meridian of 180° and longitude of 157° 31!

East.

The Joint Task Force Weather Central will coordinate

this effort.

(5)

Maintain one (1) SA-16 on continual SAR alert during other

(6)

Augment the field maintenance facilities cf the Test Support

Gone (7)
Cat:
vote

(8)

than shot and rehearsal periods.

nite

Establish and operate under operational control of Comir JTF
SEVEN the Joint Task Force Weather Central on ENIWETOK
ISLAND by first shot minus 35 days.

Establish and operate by first shot minus 35 days a ground
weather observation network, consisting of observation

stations at KUSAIE, RONGERIK, MAJURO, and PONAPE.

°

d.

, 49) Establish and operate by first shot minus 30 days complete
terminal facilities for MATS traneport operations at
ENIWETOK.

(10)

Provide airways and air commnications services as required
in support of CASTLE (RESTRICTED, SI) operations outlined
in this order. (See Annex D.)

(11)

Bxecute SAR functions as outlined in Annex I to this order.

<All Units:

(1)

Provide liaison officers to assist Headquarters TG 7.4 air-

craft controllers in the AOC, on the Command Ship and on the
Control Destroyer as required. (See Annex XK.)

> S

oe

TASK GROUP 7.4
OPRS ORDER NO.

x
1-53

9S

£

&

a

OP OX

a oe
of

4

oo

9

6e

Hk

Select target paragraph3