Ledossitie’ 10

gop pia §
(d)

Relay command directives as required to airborne

(e)

Relay all flight plans of TG 7.4 aircraft to TG

aircraft.

7.3 ae required in execution of the JTF air defense

mission,

(f)

(2)

Execute evacuation or other emergency plans as
directed by Comdr, TG 7.4.

During Shot and Rehearsal Periods Only:

(a)

Insure that TG 7.4 aircraft takeoff: sehedules are

met,

(The actual control of aircraft takeoffs will

be exercised by designated representatives of Com

mander, Test Aircraft Unit, dperating from the
Control Tower and a radio equipped jeep. These

officers will maintain direct communication with

and operate under the broad supervision of the AOC).

(b) Relay takeoff and landing times of all aircraft to
the Command Ship CIC.

(c) Maintain a current air operations board reflecting
the position of all TG 7.4 aircraft. (These Positions will be relayed to the AOC by the Command

Ship CIC, the Control Destroyer and by aircraft.)

(d)

Execute command directives from the Coumand Ship

(e)

Provide facilities for monitoring air operations

crc.

by official observers,

b. Detailed AOC SOP's will be prepared by the Senior Aircraft
Controller, TG 7.4, prior to 15 January 1954.
c.

AQC Communications Requirements:

(1)

Two (2) HF voice radio circuits to CIC, USS ESTES.

(2)

Direct telephones to Comdr, TG 7.4, Switchboard, Weather,
Base Operations, Control Tower, GCA and SAR alert.

(3)

HF, VHF voice and CW channels for SAR monitoring and
control as required,

(4) One (1) land-line teletype circuit.
(5)

One (1) direct telephone to Command Ship CIC.

(6) AN/TTQ-1 operations center equipment with display boards.
(7)

Modified Mark 10 interrogator with assoclated scopes.

(8) Three (3) VHF and one (1) HF air-ground radio channels.
5.

B36 CONTROL AIRCRAFT:

TASK GROUP 7.4

OPRS ORDER MO. 1-53

ANNEX K

ge

john

iv)

ooBe gn

Select target paragraph3