a0

pete 52009°
~~

po” v

~
ed
jassitie'

A
ANSOMIC_ ENERGY ‘COMMISSION AND DEPARTMENT OF DEFENSE
ON
RESPONSIBILITIES AND FISCAL ACCOUNTING PRINCIPLES
:
FOR
OPERATIONS AT PACIFIC PROVING GROUNDS
1.

PURPOSE:

a. The purpose of this agreement is to provide a mutually
satisfactory, general framework within which the Atomic nergy Commission
and the Department of Defense may, on an equitable basis, delineate primary responsibilities of each agency and budget and fund costs for joint
AEC-DOD operations at the Pacific Proving Ground.
subject.
2.

b.

This agreement supersedes all previous agreements on this

GENERAL:

a. Except as modified by specific paragraphs below, the costs
of the various test projects connected with the operation shall be borne
by the agency establishing the specific project scope and requirements.
be The costs of test projects of mutual interest to both
agencies will be prorated in proportion to the degree of interest.
ec. Such equipment as is reasonably available from the stocks
of either agency will, upon request, be furnished to the other agency
on a loan basis at no cost except that of operating, safequarding, and
maintaining the equipment. The AEC will not, in general, request through
military channels equipment available from commercial sources. The user
will not be held responsible for normal wear and tear but will exercise
adequate control and care of the equipment. Equipment on loan which is
lost, destroyed, or damaged beyond economical repair will be accounted
for under the existing regulations of the owning agency. The borrowing
agency will not be responsible for payment for any equipment on loan
which is lost, destroyed, or damaged beyond economical repair, except
where such loss, destruction, or damage results from willful misconduct,
gross negligency, or failure to exercise god faith on the part of an
employee of the borrowing agency, or on the part of a corporate officer

_or the person having entire supervision of the work at the Pacific
Proving Ground of a contracting firm of the borrowing agency.
d.

The load of marine craft is a special case and is governed

by a joint AEC-Department of Navy agreement outlined in OPNAV 4000.10
(10-29-51) as follows:
,
(1)

Effective this date, the following terms and condit-

tions will apply to any loans of vessels made in the
future by the Navy Department to the Atomic Energy
Commission. In addition, these terms and conditions
will be applicable to Navy vessels in the custody

of the Atomic Energy Commission as of this date,
insofar as applicable.

TASK GROUP 7.4

OPRS ORDER NO. 1-53

ANNEX J, APNDX 1

peclossified

aa?

°

OD DIR 5200.10

Select target paragraph3