BEE & & & BH
rex eke

DAY. HOR

parens
EVR (Names
ioctcate suction
wr)

First C/S USA and Chairman ABC advisories on proposed
shot time (dual cp messages) (Cowan),

Check status of codes and flight briefing for WB=29's—

(House).

Re-examine need for coaplete evacustion for U,Y,N, 8

based on results of previcus shots (House).

Evaluate waiver of MPEZ for next shot (Maupin).
Get detailed recovery plan from J-3, TG 7.1 (House).
Cneck lagoon water sampling plan with Radsafe officer,

BP

DuS

Get plan for "low order” cr "HE only“ type detonation

Du§

Review heavy nuclide samling plan with 10 7.4 Operaticna
and Or. Plank (House=Maupin).

RR Pe

Task Group 7.3 am 7.1 (House),

Dek

Cheek status of sample return plans (Cowan),

Deb

arrange for reeeipt of 1 7.3 ship intensity reports

Dek

arrarige for "Sweet-Sour" report system with 40 (Wignall).

De3

Brief Sample Return Project Officers (Conan).

Da3

alert JTF SEVEN cyeraticnal personnel for possible PEM
off~etoll, water sampling prodlens (Maupin),

from CTU 7 (House).

(House).

De3

20000

Pase forecast fall-out information to J& reference
significant sector for P2V sweep on D aimus 2 cays (House)

D=e3

2060

Mowe aboard aGC (BIKINI shots ealy).

T2

caco

Radeafe OFFICE cperational on 406 (Hq Compoulkd for

Bed

NU

Radsafe CENTER operational on CVE (Bldg 57 for INTWETCE

De2

1208

arrange for receipt of constant altitude balloon fics

D-2

1200

ENTAETOK shot) (House),
abot )

(Servs).

from Weather Central (Wignall).

Get transient ship plot from CIC of TG 7.3 thru CTU 7
(House).

GaLin

| |

Select target paragraph3