On 27 May 1960, the commander of Task Group 7.3 (J.M. Shaffer) sent a memo to the Chief of Naval personnel which noted that the nuclear test planning for FY TF 1960 and 1961 had undergone some slippage and based on the small likelihood of tests, the current allowance of 16 officers and 124 enlisted in Task Group 7.3 is expected to be satisfactory through 1 Oct. 1961. Any changes in operational requirements for the group will be used to bring about corresponding reductions where ever possible. _27May60,J-6 Report: On hearing that the AEC intends to release EPG to the MR on 1 Jul 60, J-6 recommended that certain items such as tower parts, electric al cable, etc. be returned to NTS. As for RTS, the sudden withdrawal of money by pb VY fashington has brought to a Stop the proposed work in Area 3; thus, the drilling of f alpha trailers. Procurement of coax cable and casing for the completed holes 4S progressed to the point where econ omically it would be unwise to cancel the cders and so these materials will be stockpiled at NTS. eet Lo WO new holes and deepening of two others has been cancelcd, as has the procurement Note that the TWX file continues over into 1960 and early in the year indications from the AEC to CJTF-7 are that TAC plans and operation between 30 May and 17 June which will require extensive support at the EPG. eresa* — The message was forwarded through the 4951st to the AEC who will have to provide the services at the EPG. From the 4950th references a message which they sent to the 495lst at Eniwetok detailing support that will be required for the upcoming operation supporting TAC and finishes by stating, "We have received info which leads us to believe that the contractor support at Eniwetok will be drastically reduced by 1 July. A drastic reduction in waukxxxekxxHENEuxKh contractor services would have an adverse effect on capability to support a large scale deployment through Eniwetok in areas of housing, messing, and AMR base support." the possible transfer to PMR. Clearly they are speaking of A

Select target paragraph3