11 Feb. 60 memo (COPAC 60-2) from Knapp documents changed Succotash as presently
approved by DMA:

U12j.01

Ready Date:

15 Apr. 60

( ‘W

U12e.03

40-day readiness by 15 June

U12b.09

60-day readiness by 15 June

U12e.07

40-day readiness by 25 July

“To the extent necessary to meet this schedule, certain construction including

excavation, long-lead item purchase, main drift diagnostic cable installation, etc.
was authorized.

Knapp emphasized these preparations were solely to achieve a

more advanced readiness status and were no indication, real or implied, that a
test series would be carried out.

Here is the letter from Bradbury to Hertford on J] February1960 entitled
"NTS Preparations for Possible Resumption of Nuclear Testing" and

numbered DIR 1547. .The letter,in general, gives the LASL feeling that they
would like to attempt to resume weapons testing perhaps 3 or 4 months after
a Presidential announcement authorizing such. Bradbury notes that the
Lab has a few items in the less than 1} kiloton but a number of items also
ranging from 1 to 30 kilotons that the Lab would desire to test. He notes

also that the present hole inventory at Nevada is barely suitable for 1 kiloton

shots. He feels gencrally in order to allow,tests to be performed within about
3 months after GO,the holes at Nevada mustideepened and perhaps an inventory
of a minimum of
hole each at about 500, &00, 1100 and 1800 feet would be
one possibility. He notes the great conflict in demands for personnel that would
ensuc should weapons testing begin soon since the same people would be
involved in the Rover and the Weapons Test Program and it is not clear whether

i
°

.

«

.

.

o*

f
ee

..
ee inated
teem 2

yA ep

ti ry!

~y

«yu

eYudcaud
:

.

Yo

one alternative would win out over another. Bradbury simply asks for
ALO's feelings on the LASL concept of this hole development.

A‘I2 February memo from Hohner of the Las Vegas Branch of ALO to

Recco, authorizes the ‘Recco work to begin on the four LRL tunnel sites
with the cornpletion dates as given by Starbird in his above message.
It is stressed that the costs for the work must not exceed 3.3 million dollars

and must be within F Y 60 and also that the Area 12 Camp may be expanded

with additional temporary construction funds of not more than 510 thousand
dollars. A TWX dated 18 February from Allaire of ALO to Kelly of Holmes
end Narver is apparently in response to Bradbury's letter and requests
‘-« ane schedules for completing cased holes
anticralay,

a

" 4
Aig
#

vig