28 Apr. 60, J-6 Report: As for the NTS work, procurement of the following for 2 with new and old holes in Area 3 has been requested: 16,000 ft. of a certain ve of coax cable; 48,000 ft. of another type of coax cable; connectors for various es of cable; hardware to suspend coax cable from hoisting cable. Sam Howell from « N came out at the end of Mar. to review requirements for Area 3 and a thorough scussion of operations on deep holes was carried on. ‘vious months, the following has taken place: As for items requestcd in the The bids for drilling new holes "e opencd on 26 Apr. 60; six M-G sets are to be delivered to NTS in May; 81,600 ft. : alpha trailers will open on 9 May with delivery asked for 22 July, A 28 April 1960 memo for record in JTF-7 discusses the possible transfe r of ne oe EPG to the PMR and discussions between the two organizations. Mention is mad e of few sociated hardware and cabling are to opened the first week of May; and a bid for os a certain type of coax will be delivered by mid July; bids for winches and JA Johnston Island in that it now looks very much like the Army Nike-Zeus project may back out of Johnston even through they have added 22 acres to the island, among The reason given is that firing the IRBM from Johnston creates a hazard to the natives at Kwajalein since the sustainer fragments would land in ene JA vicinity. _Here is a cross-reference to a message from Starboard to Bradbury dated 29 April’ which states that the JCAE has asked the AEC to prepare a | bibliography of references concerning the technical proble ms involved in moni toring an agreement on banning nuclear tests. LAS is to prepare the bibliography for. monitoring tests in the atmosphere and at high altitude. The referenced TWX is filed in "334 JCAE.", BR Swe other things.

Select target paragraph3