fea
8-28-53

Reproduced from the holdings of the Natioual Archives
Pacific Southwest Region

rivs

.

®

IA

EOS

(6) With a straight edge with an offsei

on sketch No.

3,

plumb

level attached, as shown

down from each of the

make the horizontal adjustment of the pipe.

reference marks

and

The actual adjustments after completing the horizontal reference
marks described above and the vertical reference plane would require

a maximum of two surveyors working with each adjustment group.

One

man on the rods and one computing grade rods and assisting as required.

David L. Narver,
DLNIrsLSHsevs

Project Manager JS
Constr.-Opér, Div. (2)

L. 8S. Hammond

Ne
prs

Project Engineering File
751 Mail Room (2)

co
my

ecs

Jf

Chief Project Engineer

Select target paragraph3