(10) Administer TG 7.5 interest in scheduling and dispatch of liaison planes and helicopters for intra-atoll transportation and aircraft for interatoll transportation in accordance with the operational system agreed upon with CITF. Administer scheduling and dispatching of the TG 7.5 boat pool, as supplemented by the TG 7.3 boat pool. Cooperate with other Task Groups in establishment of ferry schedules and in connection with the use of TG 7.5 craft for JTF SEVEN purposes, _ - (11) Administer the dispatchand maintenance of TG 7.5 and 7.1 vehicles, including scheduling and operation of land transportation systems. ee (1) Receive from JTF SEVEN, TG 7.1, 7.2, 7.3, and 7.4 operational : and construction requirements and provide for facilities, equipment, and personnel to meet these requirements, g (2) In coordination with JTF Liaison Officers expedite material and 7, embarkation to the forward area and return. (4) Determine TG 7.5 cargo requirements for air and surface trans- portation and submit monthly and special reports to JTF SEVEN covering TG 7.5 air and surface transportation. Copied/OOE LANL, J-Dlv. © e, AEC funds. 7 Continue the present system of accountability of property in the forward area procured by or for Task Groups 7.1 and 7.5 with a (3) equipment of TG 7.5 (and, if requested, TG 7.1) from the port of w, @, Function as clearing house for inter-Task Group problemsrelated to services and facilities provided by AEC and AEC contractors. or, (12) gqeeeger? In coordination with TG 7.5 staff establish necessary procedures and accumulate appropriate information for analysis of the oper~ ation and planning for future operations. . eeae¢ededq 4 (9) Establish and maintain at the forward area a readiness reporting system. ¢ (8) Coordinate operations orders and annexes with TG 7.1 to insure the safety of operations in contaminated areas and the scheduling of recovery operations within the capabilities of available support personnel, ¢ (7) evacuation and emergency plans. 7? (6) Prepare and supervise the execution of Task Group operation plans, orders, annexes, schedules of events, check-off lists, and F (5) Maintain liaison with other Task Groups in connection with requirements for the use of their facilities for test and operational purposes, Ff (4)