aan
PROCEDURE
@

The flight altitrde and operational plans were coordinated with the A0Cc

(7G 7.4) and this organisation assumed primary guard and SAR responsibility
for the mission.

The atoll and legoon (Phase A and B) were surveyed

immediately after take-off (1130 to 1230) and concluded with altitude
oorrelation passes over Engebi st 100, 200, 300 and 500 feet.

The area out to

sea was surveyed froa 1239 to 1500, and the mission terminated at Enivetok.
Based on the survey results, the aircraft wae released for return to PATRON
OME at Kwajalein and the D+2 survey cancelled.
The project equipment vase installed, checked, and calibrated in the
helicopter from 1015 through 1230 on D+2.
proceeded to Aomon.

The mission then left Parry and

Altitude runs vere asde across the bunker.

The helicorter

was hovered for one mimute at 500 and 800 feet altitudes to obtain game
spectral data.

The pilot could not hover at less then 500 feet, so that lover

altitude data was not’ obtained.
Rojoa vas selected to provide intensity date over an ares with a lover
density of contamination,

50 to 500 feet.

Altitude passes vere run ower the air strip from

The open vater runs were cencelled due to the extremely low

levels of water contamination evailsble.

EESULIS
The aerial survey over the islands of the Enivetok Atoll] have been

correlated to surface intensities.

Examinetion of this date shove little or

no fallout except the northeastern islands.

Parry and Enivetok vere not

eurveyed, however, fallout intensity measured at the surface reeched a pesk

of 20 mr/ar on D+).
No. contamination could be detected in the lagoon or at sea, around the
@

atoll.

COPY
aS
AUD
of.
at ates
bet oe
3
‘
<c.
¥,

,

*

iin

yh ey
’

Som

SAM

I

¥

Select target paragraph3