ane
P| tout)
Project 13,3 - Spectroscopy - H, Stewart
For purposes of intercomparison all results obteined by
Project 18.3 are presented and discussed in the Navajo report
where a descriptionaf instrumentation is also included.
On the 2001) Shot all equipments operated.
There
was insufficient light to give exposures on the 102 spectrographs, the U of R spectrograph and the 70 mm strip spectrograph.
Faint pictures of Teller light and fireball growth were obtained
on the Bowen and the Mod 6.
the Meinel plate.
Jaco,
A faint Teller spectrum appeared on
A good minimum exposure was obtained with the