PREPARATION OF TECHNICAL EQUIPMENT INSTALLATION. REQUEST ALSO
TEMPORARY HOUSING AND MESSING FOR HELO AIR AND GROUND CREWS
CUNDERSTOOD TO TOTAL 22) PLUS EIGHT AEC TECHNICAL SUPPORT
CONTRACTOR PERSONNEL AND TWO AEC PROJECT PERSONNEL.
REQUEST CONSIDERATION OF THE FOLLOWING ADDITIONAL REQUIREMENTS

NOT PREVIOUSLY ADDRESSED:

—

|

:

A. PERMISSION, ON A NONINTERFERENCE BASIS, TO FLY A SMALL NUMBER OF

SHAKEDOWN MISSIONS AT KWAJALEIN DURING THE PERIOD NO. 5, 6 AND 7.

SUCH MISSIONS WOULD INCLUDE LOW-LEVEL PASSES OVER SUCH LAND WASS AND
REEF AREAS AS KMR WAY DESIGNATE AND WOULD INCLUDE PHOTOGRAPHYTHERE-

OF, PHOTO TECHNICIANS ARE ALL “Q"-CLEARED AND PHOTOS WOULD, OF COURSE,
BE SUBJECT TO KMR SECURITY REVIEW.

°

.

|

B. UTILIZATION OF A SWALL AER-CONDITIONED SPACE WITH RUNNING WATER-POSSIBLY A DORMITORY OR TRANSIENT HOTEL ROOM -- TO BE USED AS TEMPORARY DARKROOM,

MR, RUSSELL LEASE OF AEC-NV WILL ARRIVE KWAJALEIN ON NOV. 3 VIA
MAC/SATURN TO SERVE AS AEC POINT OF CONTACT PENDING ARRIVAL ON NOV.
5 OF ROGER RAY, AEC FIELD SURVEY MANAGER. OASRR