ION

12682)

10 July 192

aad

MEMORANDUM FOR:

A. C. Graves

a3

FROM:

W. E. Ogle

SUBJECT;

RECENT CHANGES IN THE IVY PROGRAM

SYMBOL:

J -1293L

e
: *

_

PROGRAM 1 - RADIOCHEMISTRY
Project 1.3 - Sample Collecting

A
“a

|
s4

Dr. Harold Plank is now making arrangements for comparatively
simple\back-ups on the air sampling for Mike Shot. He plans to arrange

containérs of some sort which will allow for the collection of radioactive
water after the shot if there is difficulty with the airplane sampling.

cox

This water sampling would not be by remote control.

a

to be on Engebi.

a

He also plans to-

arrange for two blower-type air samplers, one to be on Bogallua, the other

The details of these collectors are not yet available.

PROGRAM 2 - PROGRESS OF THE NUCLEAR REACTION
Projects 2,2, 2.3, and 2.4 have been gr atly changed from the techThe samequantit 8) i.e., time between the

nigues originallyplanned,

However, instead of the signals being tran fitted by light from the Domb
to the recording station, they will now be transmitted by gamma rays. In
order to transmit the signal that fergby gamma sayy , it will be necessary

to replace the air between bomb a
rise of the reaction
gemma rays formed in

the uranium

ation with helium. The

will be observed by
e bomb. The propagation

of the reaction will be observed by@anex-type experiments.

Further

detaile of this experiment are available in the J-Division monthly report

for June.

Because of the replacement of air b
to measure t

been added as Project 2.6,

fa
io

a Tenex-t

experiment

The project director is Dr. E. H. Krause.
NCELLED
CLASSIFICATION CA

.

r

rrea:bited,

Copled/Doge

.

spot

LANL,J-Diy,

FOU

Guricuybee
PANG RC

Select target paragraph3