facility at Treasure Island, San Francisco, Calif., and at LASL. The four
Navy hospital corpsmen who provided the bulk of the laboratory services
were trained by LASL Health Division personnel.
Dosimetry and Records
personnel received extensive training in the use of IBM equipment at Ft.
McClellan, Ala.
This training was conducted by the Birmingham, Ala.,
office of IBM.
Scientific project personnel in TG 7.1 and contractor personnel in
TG 7.5 were requested to provide their own monitors for recovery and construction missions. A four day school was operated at Parry and Enyu
islands specifically to train such monitors. The school was in session for
approximately seven weeks. Personnel from TG 7.3 and TG 7.4 were also
trained at the school,

(radex).
id manning
iry services
.

¢@

sonnel and
ruments.

activity in

ngth was 59;
y problems
3 of photozes issued
rocessed by
was not a

13. However,
on and radisk Unit.

,

Navy,,and

Chemical
‘gs a break-

|

|

ices.

The

ieClellan,

ly 40 mem-

aumbbob at

* Co, rad-safe

at the Navy

|

Select target paragraph3